This week has been a chance for me to ensure that everything with regards to my final film and actual installation is already for Friday’s hand in and assessment. On Monday i went to see Greg with regards to obtaining the headphone splitter and cable needed to run the audio through my laptop. As my room i am using for the degree show was already booked on Friday i have booked the other photography studio, ETG05. I have ETG05 booked on Thursday evening from 16:00 pm – 21:00 pm which provides me with plenty of time to set up my installation as i am only able to book it out between 9:00 am – 12:00pm on Friday, so to ensure i am already for Friday’s 10:00 am viewing, i have left myself with plenty of time to set up the night before, covering for any technical hitches etc.
With regards to the hand in requirements i have gone through my blog ensuring i have covered the main aspects of my idea creation, exported my film as a quicktime file burnt it to CD and DVD and also created my DVD cover. I am recording the final film to DV Tape tomorrow and then i am already to hand in my work at reception between 11:00 am – 15:00 pm.
As i want tomorrow’s set up to go as smoothly as possible i have compiled a list of all the bits of my installation and tools i will need to take with me to enable me to set up the installation with ease.
Installation Set Up – Check List
Tools
1x spanner
1x box of spare bolts
1x box of screws
1x electric phillips screwdriver
Installation pieces
2x Side Panels
1x Back Section
1x Front section
5x Prop stands
2x Floor Brackets
1x Bag of Sand
1x Bag of Pebbles
1x Bag of Shells
1x Bucket and Spade
1x Deckchair
1x Laptop
1x Beach Umbrella
1x Wind Breaker
2x Groundsheets
1x Dustpan and Handbrush


